mortar calculator · Wyoming

Mortar Calculator — Wyoming

Estimate how many 80-lb bags of mortar you need to lay brick or concrete block. Pick brick or block, enter how many units you are laying, and this calculator divides by the published per-bag yield — with a waste allowance you control, since spillage runs high. Quantities are the same nationwide; this page adds a Wyoming price estimate for delivered material, scaled from national averages by a regional cost index.

Quick answer

Laying 500 bricks needs ~17 × 80-lb bags of mortar — at about ~35 bricks/bag — including 15% for waste.

You order: 17 bagsStandard industry factors

Estimated mortar price · Wyoming

~$11 / bag

Typically $8.00–$15 per bag delivered in Wyoming. A 500 standard bricks pour (~17 bags) runs about $187.

Regional estimate, not a firm quote — national averages scaled by Wyoming’s cost index (0.99×, measured confidence). How this is calculated →

Enter your project

Build your estimate

Start with a preset

15%
0%30%

Leave at 0 to skip the cost estimate.

$ / bag

Live result

17 bags

What you order

  • Bricks to lay500 bricks
  • Per 80-lb bag~35 bricks/bag
  • Mortar to order17 × 80-lb bags
Standard industry factors · confirm with your supplier

The model, unpacked

Scenario breakdown

500 standard bricks

Bricks to lay

500 bricks

Per 80-lb bag

~35 bricks/bag

Mortar to order

17 × 80-lb bags

You may also need

Planning a full project? Most jobs use more than one material. You will often pair concrete and sand with mortar on the same site.

How this mortar calculator works

The calculator turns your unit count into bags. You pick brick or block and enter how many you are laying. It divides that count by the number each bag lays. Then it rounds up to a whole bag and adds a waste allowance. It reports the bags of pre-mixed mortar to order.

Mortar is the bonding mix that holds brick and concrete block together. This tool estimates 80-lb bags of pre-mixed mortar. Each 80-lb bag yields about 0.6 cubic feet of mixed mortar. That volume is what lays your units at standard joints.

The default settings assume 3/8-inch joints. At that joint width, one bag lays about 35 bricks or about 13 standard blocks. The calculator uses these yields to size your order. You enter the count, and the math runs from there.

The default waste allowance is 15 percent. Mortar spillage is high on most jobs. Some mix falls off the trowel. Some hardens in the mixer or the board before you use it. The waste allowance covers those losses so you do not run short.

You can adjust the inputs to match your work. Change the joint width if you are not using 3/8-inch joints. Change the waste percent if your crew wastes more or less. The result updates each time you change a value.

The calculator gives you a starting order, not a guarantee. Site conditions, unit size, and crew habits all shift real use. Treat the number as a close estimate. Buy the reported bags, and keep a receipt so you can return unopened ones. Round to full bags because mortar sells by the bag.

Bricks versus blocks: different bag yields

Brick and block use different amounts of mortar per unit. The calculator asks which one you are laying for this reason. A standard brick is small, so one bag lays many. A concrete block is large, so one bag lays few. The two yields are not close.

One 80-lb bag lays about 35 standard bricks at 3/8-inch joints. Brick joints are thin and the units are small. So the mortar spreads across many pieces. If you enter 1,000 bricks, the tool divides by 35 first. Then it adds waste and rounds up.

One 80-lb bag lays about 13 standard 8x8x16 concrete blocks at 3/8-inch joints. Blocks are hollow and large. You lay mortar only on the face shells, not the full bed. Even so, each block uses more mortar than a brick. Fewer blocks fit per bag as a result.

These yields assume standard unit sizes. A modular brick and a standard 8x8x16 block are the reference units here. Oversized brick or larger block will use more mortar per piece. Thin brick veneer uses less. Check your unit size before you trust the count.

Do not mix brick and block in one estimate. Run the calculator once for the brick and once for the block. Then add the two bag totals together. This keeps each yield correct for its unit. Mixing them in one entry gives a wrong number.

Count your units carefully before you enter them. Walls, corners, and openings change the piece count. A rough guess at units becomes a rough guess at bags. Measure the wall area, then convert to units, then run the tool. Accurate units drive an accurate bag order.

How joint width changes mortar

Joint width is the gap of mortar between units. The standard joint is 3/8 inch. The per-bag yields of 35 bricks and 13 blocks assume this width. A wider joint holds more mortar. So a wider joint drops the number of units each bag lays.

A 1/2-inch joint uses about 10 percent more mortar than a 3/8-inch joint. The extra width adds volume to every bed and head joint. Across a full wall, that adds up fast. If you plan 1/2-inch joints, raise your bag count by about 10 percent.

A 5/8-inch joint uses about 25 percent more mortar than a 3/8-inch joint. This is a wide joint used for some looks and some block work. The volume climbs sharply at this width. Add about 25 percent more bags if you lay 5/8-inch joints.

The calculator lets you set the joint width. Pick the width that matches your plan before you read the result. The tool then scales the yield to fit. A wrong joint setting throws off the whole order. Confirm the joint before you buy.

Thinner joints use less mortar, but do not plan below 1/4 inch. Very thin joints are hard to keep even and can weaken the wall. Most brick and block work sticks near 3/8 inch for good reason. Match the joint to the unit and the code, not to the mortar you want to save.

Keep your joints consistent as you lay. A joint that drifts wider than planned burns mortar you did not order. Use spacers or a story pole to hold the line. Even joints look better and use the mortar you estimated. Consistent work makes the estimate hold true.

How much extra to add for waste

Waste is the mortar you buy but never lay in the wall. The calculator adds a waste allowance on top of the base amount. The default is 15 percent because mortar waste runs high. This buffer keeps you from a mid-job supply run.

Mortar is lost in many small ways. Some falls off the trowel and hits the ground. Some drops as you cut the excess from a joint. Some hardens on the board before you spread it. Each loss is small, but they add up over a wall.

Mixing adds its own waste. Mortar starts to set once you add water. If you mix more than you can lay in about 90 minutes, the rest stiffens. Stiff mortar goes in the bucket, not the wall. A steady mix pace holds this loss down.

Raise the waste percent for hard jobs. New masons waste more while they learn the trowel. Cold or windy days speed setting and add loss. Complex walls with many cuts also waste more. On these jobs, 20 percent is a safer allowance than 15.

Lower the waste percent for clean, simple work. An experienced crew on a straight wall in mild weather wastes less. You might drop to 10 percent in those conditions. Do not go below 10 percent. Some waste is certain on every mortar job.

The waste allowance protects your schedule, not just your budget. Running out of mortar stops the wall. A cold joint forms where fresh mortar meets set mortar. That joint can be weak. Buying a little extra keeps the pour continuous and the wall sound. Return unopened bags later if you overbuy.

Buying and mixing mortar

This calculator sizes pre-mixed mortar in 80-lb bags. Pre-mixed bags hold sand and cement blended to a set ratio. You add water and mix. This is the simplest path for most jobs. The bag count from the tool tells you how many to buy.

Buy all your bags in one trip if you can. Bags from one batch mix to a consistent color and strength. Buying more later can bring a slightly different shade. On visible walls, color shifts show. One order keeps the wall uniform.

Store the bags dry and off the ground. Mortar is cement based and absorbs moisture from the air and the floor. A damp bag can harden before you open it. Keep bags on a pallet under cover. Use older bags first so none sit long enough to spoil.

Mix only what you can lay in about 90 minutes. Add clean water slowly and mix to a smooth, workable body. The mortar should hold its shape on the trowel and not run. Too much water weakens the bond and drops the strength. Follow the ratio on the bag.

Retemper with care. If the mix stiffens on the board, you may add a little water once to restore it. Do this only within the working time. Do not add water to mortar that has begun to set hard. Set mortar is spent, so mix a fresh batch instead.

Clean your tools and mixer before the mortar sets. Dried mortar is hard to remove and can taint the next batch. Rinse the mixer, the board, and the trowels at each break. Clean gear mixes cleaner mortar. Good habits at the mixer protect the wall you are building.

Working time and weather

Mortar has a limited working time once you add water. Plan to lay each batch within about 90 minutes. After that, the mortar stiffens as the cement sets. Stiff mortar bonds poorly and wastes what you mixed. A steady rhythm between mixer and wall keeps mortar fresh.

Heat shortens the working time. On a hot, dry day, mortar sets faster and dries out sooner. Mix smaller batches so none sits too long. Dampen very dry brick and block before laying. Dry units pull water from the mortar and weaken the bond.

Cold slows the set and brings real risk. Mortar should not freeze while it cures. Ice in the mix breaks the bond and ruins the joint. Do not lay in freezing weather without heat and cover. Most crews stop when temperatures near freezing and stay there.

Wind dries mortar as fast as heat does. A steady wind pulls water from the surface of fresh joints. Screen the work area when wind is strong. Keep the mixed mortar covered on the board. Small steps hold the moisture the mortar needs to cure.

Cure the fresh wall in the first day or two. New joints need moisture to gain strength. In hot, dry, or windy weather, mist the wall lightly. Shade it from direct sun where you can. Slow, moist curing builds a stronger joint than fast drying.

Working time does not change the bag count you order. Weather changes how you mix and lay, not how much mortar the wall needs. The calculator sizes the total mortar for the units and joints. Weather only shifts your pace and your batch size. Plan the schedule around the weather, and keep the order the same.

Common mortar estimating mistakes

The most common mistake is ignoring joint width. Many people take the 35-brick and 13-block yields as fixed. Those numbers assume 3/8-inch joints. Wider joints use more mortar, up to 25 percent more at 5/8 inch. Set the joint width before you trust the count.

Another mistake is mixing brick and block in one entry. The two units have very different yields. Thirty-five bricks fit in a bag, but only 13 blocks. Combining them in one number gives a wrong total. Run the tool once per unit type, then add the results.

Skipping waste is a frequent error. Mortar waste is high, so a bare unit count falls short. Spillage, cutting, and stiffening all take a cut. Without a 15 percent allowance, you run out before the wall is done. Keep the waste allowance on every estimate.

Guessing the unit count throws off everything downstream. The tool trusts the number you enter. A rough guess at bricks becomes a rough guess at bags. Measure the wall area first, then convert to units. Accurate units are the base of an accurate order.

Using the wrong unit size is easy to miss. The yields assume modular brick and standard 8x8x16 block. Oversized brick and larger block use more mortar each. Thin veneer uses less. Check your actual unit size and adjust your expectations if it differs from the standard.

A final mistake is buying too little to save on the order. Running out stops the wall and forms a cold joint. That joint can be weak and shows on the face. It is better to buy a few extra bags and return the unopened ones. Keep the receipt so a return stays simple.

Interpret the output

What makes this move?

A trustworthy estimate explains the levers behind the number. These are the factors that change how much you need to order.

01

Bricks vs blocks

One 80-lb bag lays about 35 bricks but only about 13 standard blocks — the unit type changes the bag count.

02

Joints eat mortar

Wider joints use more: 1/2-in joints need ~10% more than 3/8 in, and 5/8-in joints ~25% more.

03

Waste runs high

Spillage and board loss are significant, so 15% waste is a sensible default for mortar.

FAQ

Common questions

Straight answers about quantities, conversions, and how much to order — no lead-gen fog.

One 80-lb bag of pre-mixed mortar lays about 35 standard bricks at 3/8-inch joints. Brick is small, so a bag covers many pieces. Wider joints or larger brick drop that number. The calculator divides your brick count by 35, then adds waste and rounds up to full bags.